Back Fill

Simple stuff.  They did some of the back fill and rough-graded a bit.  They have some more work to do, as do we, in making sure the land is sloped properly and all of the excess dirt is spread out evenly. 

Jace said the lumber would be delivered Monday and they would start framing early in the week.  Even now, with the basement filled in, the house is starting to feel whole and real.  I'm sure once it is framed, it'll be even more insane and that much closer to being a reality.  Becky and I can't wait!

DAY 18

Building up towards the front porch

Under the porch.  I'm assuming they have more to fill.

Under the garage

From the sun room towards the back wall.

Basement.

Way back in the back yard.

Coming out of the basement double doors.