Sunday, August 25, 2013

Plumbing / Electrical Fixes

Sorry I haven't updated in a while.  Between getting a new job and having to start it immediately, coaching for fall sports starting and dealing with the house, I've had very little time to do anything else (I'm three episodes behind on Dexter!!!)


Anyway, minor hiccups aside, the last two weeks have been decent and the house is basically finished.  The plumbers came in on the 14th to do their thing, even though they were supposed to be there the previous week.  It was incredible to see running water in the house and to hear a toilet flush.  I was actually quite happy with the power room pedestal and toilet, but the sinks and fixtures in the other bathrooms are incredibly drab.  I'm sure I won't update them anytime soon, but they are very "premium" to say the least.  Becky and I are already talking about how to redo our entire master bathroom.  We planned that whole thing out very poorly.  The rest of the house, though, is pretty kick ass and our sun room is going to be the key ingredient to the whole thing coming together.  It opens the house up tremendously and gives us room to breathe.

The electrical guys were back out that week to fix the outlet behind the stove, the line running to the fan in the sun room (it didn't work...) and to finish off the basement.  Thank God they are done.  They were by far the worst part of this whole experience and the reason we are over a month late in getting our keys.


DAY 141

On Thursday the 14th, the water was rolling.

 The outlet and light we were promised.. now where is that spigot...???

Does this mean I have to do dishes now?


Each bedroom has a fan with a light.

Very basic fixtures, but who am I to complain about such a lovely house?


Master bathroom = ew.



Access panels to the tub in the master bedroom in above in the pantry (see below).